Skip to main content

YOP: Week 25

     I haven't accomplished much this week.  I was sent home from work Monday and didn't go to my second job Tuesday because of the pesky cold.  But rest and lots of cough medicine is what I needed.  

    I ripped back on the mitten I had started.  I decided to use the cuff even though it was two stitches larger than the cuff called for in the new pattern I'm using.  I simply decreased stitches on my first plain round.  I finished that mitten except for the thumb.  The pattern is Hollyhock Mittens and its free.  Its a pretty simple pattern and I like it.  I'm using Malabrigo Rios.  I'm meeting gauge for the pattern, but I like my mitten fabric a bit more dense than this, so if I ever knit this pattern again, I'll probably go down a needle size or two and knit a larger size.  



    I finished the dishcloth I started two weeks ago.  It was just a quick round Petal Dishcloth.  I have the pattern memorized at this point.  I'm using some of my original Peaches and Creme yarn.  I sold quite a few dishcloths at work a few weeks ago so I need to replenish my absurdly large stash.



    It's the end of Year of Projects for everyone else who follows the original schedule.  For me its mid-year.  I can't believe this year is half over already.  I took a quick look at what I've accomplished since January.  Minus the two projects I highlighted above as I didn't have pictures of those yet.



    Speaking of accomplishments.  Ronon graduated from Pre-K on Friday.  The school had a nice celebration that parents were able to attend.  This coming week is the last few days of school for both the kiddos.   


That's it from me.  Until later.

-Q


   

Comments

  1. Congrats on the promotion. Will he be attending kindergarten in August? Lovely color on the mitts.

    ReplyDelete
    Replies
    1. Yes, he'll be going to Kindergarten when school starts back up in September. Liara will be in 4th grade.

      Delete
  2. Wow, your schools go late. Ours were out at Memorial Day. Don't even get me started on how absurd it is to send kids to school in unairconditioned buildings in mid-August while letting them out the end of May. Love your mitten pattern and the dishcloth pattern. I can definitely see that pattern selling well.

    ReplyDelete
  3. I hope you're feeling better soon. I love the colour of your mittens. I always thought that children in America started their summer holidays at the beginning of June. I certainly got that one wrong. Have a good week.

    ReplyDelete
    Replies
    1. Other areas of the country start in August and end at the very beginning of June. In my area it's been September to mid June since my parents were kids. I don't know if it's because we're rural and used to be mostly farms.

      Delete
  4. For being halfway through the year, you have accomplished quite a bit. Hopefully that pesky cold heals quickly.

    ReplyDelete

Post a Comment

Popular posts from this blog

YOP: Week 29

    The fair was a success.  My items did well and Liara got some ribbons as well.  We went to the parade on Tuesday, then down to the grounds once it was over.  We stopped by one local vender to grab some jewelry, grabbed some donuts from the Donut Diner then went to see how we placed.  Liara entered earrings that she hand-made with clay.  They did not place.  She entered a beaded bracelet that got first. She also entered three of her drawings.  A Pegasus, a bunny and a magical worm.  The bunny and the worm received third and the Pegasus received second.   The bunny is my personal favorite of all the drawings she's done.  There is always a really good turn out in the drawing and photography categories, so she was up against some stiff competition.  I'm really happy she received some ribbons. My items are as follows: Rotini Beanie; First Enchantress MKAL; First. Sunburst Potholder; Second.  Cow and Hen Dishcloth set; ...

Year of Projects: Week 53; El Fin.

      I thought I'd do a quick review of my Year of Projects.  I started participating around week 5 so I'm summing up my year from that point to present.  I have 24 project entries on Ravelry.  (If I do several dishcloths back-to-back, I usually only make one project entry, so there are more than 24 individual finished items.  Direct Link to Goal Post:  YOP first post   I finished: -3 pairs of fingerless mitts -2 pairs of mittens -2 pairs of socks -5 hats -2 cowls -2 baby blankets -16 dishcloths -1 potholder -1 shawl I have one sock that's going to be frogged and half of another dishcloth that's sitting around because I ran out of that colorway of yarn.  I do have a few other WIPs still hanging about from prior to August of last year.  (We're going to keep pretending they don't exist.) I made a simple little picture "movie" of my projects, enjoy: As far as my quickly thrown together list: I completed 3/5 of my projected projects......

YOP: Week 52

      As the year comes to a close, I've been looking at my queue and starting to plan out a few projects for 2025.  After having to cold sheep for the majority of this past year, I'm going into next year with some guidelines.  When I purchase yarn, I really want to stick to purchasing for specific patterns.  I took advantage of Miss Babs annual gratitude sale and purchased specifically for two patterns.  I also want to continue to knit from stash whenever possible.  I have paired up yarn with patterns for several and they've been moved up in my queue.     I'll have more time, so I plan to participate in several swaps in 2025.  I'll be getting yarn from these so I'm going to try to stick to swaps only for "unplanned" stash acquisition.  I have several carry-over projects I didn't get to this year, which seems to be a theme every year.  So tentatively this is my meager list for 2025: - Butterfly--Papillon  with Urth Ya...